Hydropower Asset Intelligence

Vika Hydropower Plant – NVE ID 1628

Vika is a hydropower facility in Nordland, Norway, operated by MO INDUSTRIPARK AS. Explore technical specifications, ownership structure, and data-driven insights for institutional investors.

Vika at a Glance

Vika is a hydropower plant located in Rana municipality, Nordland county, Norway [1]. The facility holds NVE registration ID 1628 and has been operational since April 25, 2007 [2][3]. As a Kraftverk (power station) [4], it forms part of Norway's critical renewable energy infrastructure and is classified within the NO4 electricity price zone [5].

The plant is held under concession by **MO INDUSTRIPARK AS** [6], a major industrial operator in the region. Its strategic location near Mo i Rana Industripark (~1 km) positions it within one of Norway's established industrial clusters, supporting both energy-intensive manufacturing and grid stability [7].

Ownership & Operator Context

The primary concession holder is MO INDUSTRIPARK AS, an entity with deep roots in Nordland's industrial ecosystem [6]. The concession status with Norway's energy regulator (NVE) is currently granted_pending [8], reflecting the regulatory framework governing hydropower operations in Norway.

For detailed information about the operator's portfolio, regulatory history, and investment structure, visit the MO INDUSTRIPARK AS owner profile.

Hydrological System & Catchment

Vika draws water from the **KYSTFELT** catchment system [9], a coastal watershed that supplies multiple hydropower facilities across Nordland. Understanding the hydrological context is essential for long-term production forecasting and climate-related risk assessment.

The KYSTFELT system's precipitation patterns, seasonal runoff characteristics, and multi-year water availability directly influence Vika's operational performance. Detailed hydrological data—including gross head, catchment area, and historical inflow statistics—are available to registered users on the platform.

Regional Context: Rana, Nordland

Vika operates within Rana municipality in Nordland county [1], a region with strong hydropower heritage and industrial demand. The facility participates in the NO4 price zone [5], which reflects regional electricity market dynamics and grid constraints.

Grid Infrastructure

The nearest Statnett transmission substation is SVABO, located approximately 2.1 km from the plant [10]. This proximity to high-voltage infrastructure supports efficient power evacuation and grid integration, a critical factor for institutional investors evaluating operational resilience and market access.

Industrial Proximity

Vika's location within ~1 km of Mo i Rana Industripark [7] underscores its role in supporting energy-intensive industries. This geographic advantage enables both direct industrial offtake agreements and participation in the broader Nordic electricity market.

Data Center Suitability Assessment

HydroSec's proprietary assessment framework rates Vika with an A-grade data center suitability score [11]. This top-tier classification reflects the plant's operational stability, grid proximity, and infrastructure readiness for mission-critical applications.

What the A-grade indicates:

  • Strong operational track record since 2007
  • Reliable grid connection and transmission infrastructure
  • Favorable location for industrial or data center partnerships
  • Consistent regulatory standing

Note: The maximum data center capacity threshold and detailed technical sub-scores are available exclusively to registered users. These metrics require site-specific engineering assessment and are not disclosed in public summaries.

What You'll Unlock After Registration

HydroSec's full intelligence layer on Vika includes:

  • Technical specifications: Installed capacity (MW), annual production (GWh), gross head (m)
  • Hydrological detail: Catchment area, long-term inflow statistics, seasonal variability
  • Financial modeling inputs: Production forecasts, grid pricing exposure, operational cost benchmarks
  • Infrastructure mapping: Detailed substation data, transmission constraints, backup systems
  • Regulatory timeline: Concession renewal dates, environmental compliance records, NVE correspondence

These data points are essential for institutional due diligence, portfolio optimization, and risk-adjusted return modeling.

Related Resources

Explore related hydropower facilities and asset classes:

Risks and Limitations

Regulatory Risk: Vika operates under a concession framework subject to periodic review and renewal by Norway's energy regulator (NVE). Changes in environmental policy, water rights allocation, or grid requirements may affect operational scope or profitability.

Hydrological Variability: Production is inherently dependent on precipitation and runoff in the KYSTFELT catchment. Multi-year droughts, climate change impacts, or upstream water management decisions can materially affect annual output.

Market Risk: As a participant in the NO4 price zone, Vika's revenues are exposed to Nordic electricity market prices, which fluctuate based on regional supply, demand, and transmission constraints.

Data Limitations: This public summary does not include proprietary technical specifications, financial projections, or detailed site assessments. Institutional investors should request full data access and conduct independent due diligence before making investment decisions.

Disclaimer: This page provides factual information sourced from NVE public registers and HydroSec's data platform. It does not constitute investment advice, legal counsel, or tax guidance. All investment decisions should be made in consultation with qualified financial, legal, and technical advisors. Past operational performance does not guarantee future results.

Frequently asked questions

What is Vika's NVE registration ID?

Vika's official NVE (Norges vassdrags- og energidirektorat) registration ID is 1628 [1].

When did Vika begin operations?

Vika became operational on April 25, 2007 [3].

Who holds the primary concession for Vika?

MO INDUSTRIPARK AS is the main concession holder for Vika [6]. Detailed information about the operator is available on the MO INDUSTRIPARK AS owner profile.

Which electricity price zone does Vika operate in?

Vika participates in the NO4 price zone [5], which reflects regional electricity market conditions in Nordland.

What is Vika's data center suitability rating?

Vika receives an A-grade data center suitability assessment [11], indicating strong operational stability, reliable grid infrastructure, and favorable conditions for mission-critical applications. Detailed capacity thresholds and sub-scores are available to registered users.

How far is Vika from the nearest transmission substation?

The nearest Statnett transmission substation, SVABO, is located approximately 2.1 km from Vika [10], supporting efficient grid integration.

What hydrological system supplies Vika?

Vika draws water from the KYSTFELT catchment system [9]. Detailed hydrological data, including inflow statistics and seasonal patterns, are available to registered users.

Why should I register for full data access?

Registration unlocks technical specifications (installed capacity, annual production, gross head), detailed hydrological data, financial modeling inputs, infrastructure mapping, and regulatory timelines—all essential for institutional due diligence and investment analysis.

Sources

Explore Norwegian hydropower plants

1,855 plants · 17 industrial sites · 1,558 substations · NVE, HydAPI, Statnett, Kartverket.

See score rankingSign in (free)